- Overview
- Application
- Meet the standards
- Features
- Machine structure
- Product Parameters
- Company Profile
- FAQ
Basic Info.
Product Description
This series of products are widely used in the aviation, aerospace, electronics, IT industries, instrumentation, electrical products and other simulated samples to test the adaptability of simulated samples under rapid changes in ambient atmospheric temperature and to provide reliability testing for the safety of electronic components. Product screening, etc.
Three-chamber Thermal ShockThe cold and thermal shock test chamber is used to test the degree of endurance of material structures or composite materials under the continuous environment of extremely high and low temperature in an instant, so as to test the chemical change or physical damage caused by thermal expansion in the shortest time. Suitable for universities, research institutions, quality testing, including electronic appliances, LED lighting fixtures, automotive accessories, computer peripherals, plastic and rubber, etc Such materials can serve as a basis or reference for product improvement.
GB/T2423.1-2008 Environmental testing of electrical and electronic products Part 2 Test methods Test A Low temperature
GB/T2423.2-2008 Environmental testing of electrical and electronic products Part 2: Test methods Test B: High temperatureGB/T2423.22-2012 Environmental Test Part 2: Test Method Test N: Temperature Change
GJB150.5-2009 Environmental test methods for MIL equipment - Temperature shock test
GJB150.5A-2009 MIL equipment laboratory environmental test methods Part 5: Temperature shock test
GJB360B-2009 Test methods for electronic and electrical components
GB/T2423.1-2008/IEC6008-2-1-2007 Environmental testing of electrical and electronic products Part 2: Test methods Test A: Low temperature
GB/T2423.2-2008 Environmental testing of electrical and electronic products Part 2: Test methods Test B: High temperature
GB/T10589-2008 Technical conditions for low temperature test chamber
GB/T11158-2008 High temperature test chamber technical conditions
IEC68-2-14 Test method N: Temperature change
1. Use the internationally accepted energy storage method to conduct impact tests at hot and cold temperatures.
2. Touch-sensitive color LCD display human-machine interface controller, easy to operate.3. Graphical function display, with abnormal or fault display and troubleshooting instructions.
4. The temperature control has high precision and all adopts PID automatic calculation control.
5. The air volume is evenly distributed to ensure uniform test exposure.
6. It has a reservation start function and can choose the impact mode (high temperature first or low temperature first.)
7. The number of cycles and automatic defrost can be set.
The pre-cooling area, preheating area and test area are independent. The three boxes can be switched through the air door without moving the test product. When the room temperature is affected, the ambient temperature is introduced into the test space through the blower to eliminate the heat or cold in the test space. At the same time, The damper of the high and low temperature tanks is closed; when the low temperature is hit, the dampers of the high temperature and normal temperature tanks are closed, and the low temperature tank is connected to the test chamber, and the pre-stored cold energy is instantly introduced into the test chamber; when the high temperature is hit, the dampers of the low temperature and normal temperature tanks are closed, and the high temperature tank is connected to the test chamber. , instantly introducing the pre-stored heat into the test chamber. This achieves the purpose of rapid temperature changes.
Main Specifications | ||
Temperature: | ||
High temperature zone | Temperature range | RTºC~+200ºC |
Heating time | RT~+200ºC: about 30min | |
Low temperature zone | Temperature range | RT~-55ºC |
Cooling time | RT~-55ºC: about55min | |
Studio | Temperature shock range | -65ºC~+150ºC |
Temperature fluctuation | ≤±0.5 | |
Temperature deviation | ≤±2ºC | |
Temperature uniformity | ≤2ºC | |
Temperature conversion time | ≤10s(Damper opening time) | |
Temperature recovery time | ≤4min | |
Operation mode | There are two high and low temperature impact modes and high and low temperature + room temperature impact modes, which can be set by the human-machine interface. | |
High and low temperature shock mode | 150ºC(30min)-NC--40ºC(30min) | |
High and low temperature + room temperature impact mode | 150ºC(30min)-room temperature--40ºC(30min) | |
Power | High greenhouse power: 9KW Low temperature greenhouse power: 9KW Other power about: 2KW Maximum power about: 20KW Operating power approximately: 12KW | |
Voltage | Power requirements: 380V 50HZ three-phase five-wire system plus ground wire Power: 20KW Current 40A | |
Condensation method | Water cooling |
1.Q :How to provide after-sales service?
A:If customers need our engineers to come to the site for service, we will send out engineers to provide repair service for you.
2.Q: Can we visit and study in your factory?
A: Welcome to visit and study in our factory, we will show you our R&D and production capacity.
3.Q :Can I install and commission the calibration equipment on site?
A: Yes, we can send technicians and engineers to the customer's site for installation, commissioning and calibration.
4.Q: What are the transportation methods?
A :Air freight, sea freight, railroad transportation, all transportation methods according to the customer's needs.
5.Q : What are the packing methods?
A: Standard export wooden box packaging, solid and firm.
6.Q :How do you calibrate the equipment?
A: We have our own calibration and third-party calibration.
7.Q :What are the payment methods?
A :The payment methods are T/T, CIF, Paypal, L/C, VISA and so on.
8.Q :How long is the warranty period?
A :Warranty is 1 year, lifetime free service.
9.Q :What is the delivery time for your company's products?
A :This depends on the actual product you order, usually at least 30 days.